2J Sidewalk Gap Project

Share 2J Sidewalk Gap Project on Facebook Share 2J Sidewalk Gap Project on X (formerly Twitter) Share 2J Sidewalk Gap Project on Linkedin Email 2J Sidewalk Gap Project link

About this Project

In 2023, Wheat Ridge voters passed ballot measure 2J with approximately 70% support, extending a half-cent sales tax for important infrastructure improvements. One initiative receiving funding through 2J is the city's effort to close existing gaps in our sidewalk network.

Now, the city is working to design and construct missing sidewalk segments along key pedestrian routes to improve safety, accessibility, and connectivity throughout Wheat Ridge.

Like many communities, Wheat Ridge’s transportation network was originally designed primarily for cars, leaving gaps in the sidewalk system. Over the past two decades, residents have increasingly identified walking access and safety as community priorities. This project addresses those needs by filling critical sidewalk gaps near schools, parks, and other destinations.

Round 1 segments, scheduled for construction in 2026 and early 2027, include:

  • Parfet Street (35th Avenue to 3550 Parfet Street)
  • I-70 Frontage Road (Holland Street to Garrison Street)
  • Harlan Street (32nd Avenue to 35th Avenue)

Round 2 segments, currently in design, include:

  • Miller Street (44th Avenue to 48th Avenue)
  • Pierce Street (29th Avenue to 44th Avenue)
  • 26th Avenue (Oak Street to Paramount Parkway)

Additional segments will be identified after completion of these first priority sections.


Miller Street Improvements

One of the sidewalk gaps that the city is currently working to fill is on Miller Street between 44th Avenue and the I-70 Frontage Road.

Why Miller Street

  • Miller Street links both Mountain Phoenix Community School and Compass Montessori Wheat Ridge to nearby neighborhoods, the Clear Creek Greenbelt, and parks that classes use for outdoor learning.
  • Many students arrive by car to these public charter schools that serve families from across the broader community, with parents and caregivers parking or dropping students off along Miller Street or nearby streets before students walk the remaining distance to school.
  • Sidewalks are narrow, damaged, or missing in places, and some curb ramps do not meet accessibility standards. Traffic, drop-off activity, and street crossings add to the risk for students on foot.

Planned Improvements to Miller Street

The city's proposed Miller Street improvements include:

  • Reconstructing or widening deficient sidewalks and closing sidewalk gaps along Miller Street;
  • Installing or improving ADA-compliant curb ramps;
  • Improving pedestrian crossings and pavement markings; and
  • Pairing the infrastructure improvements with school-based safety education and activities that encourage students and families to safely walk, bike, or roll to school.

Leveraging Grant Funding - How You Can Help!

To help make our funding go further, the city also pursues grant funding to supplement appropriate projects. Because of the proximity to two schools, Miller Street is a great candidate.

The city is preparing an application for Colorado Safe Routes to School funding to help construct the Miller Street improvements. As part of this effort, the City is partnering with Mountain Phoenix Community School and Compass Montessori Wheat Ridge to gather information about how students travel to school, where families encounter safety concerns, and how the planned improvements could make walking and biking safer.

If you are a parent at either of these schools, please fill out the survey below. Your feedback will help the city demonstrate the need for the project, strengthen its grant application, and support safer walking and biking connections for students and families. The city hopes to hear from at least one in four families at each school.

Please complete the survey by Friday, December 18 at 5 p.m. Thank you for taking the time to share your experiences!

About this Project

In 2023, Wheat Ridge voters passed ballot measure 2J with approximately 70% support, extending a half-cent sales tax for important infrastructure improvements. One initiative receiving funding through 2J is the city's effort to close existing gaps in our sidewalk network.

Now, the city is working to design and construct missing sidewalk segments along key pedestrian routes to improve safety, accessibility, and connectivity throughout Wheat Ridge.

Like many communities, Wheat Ridge’s transportation network was originally designed primarily for cars, leaving gaps in the sidewalk system. Over the past two decades, residents have increasingly identified walking access and safety as community priorities. This project addresses those needs by filling critical sidewalk gaps near schools, parks, and other destinations.

Round 1 segments, scheduled for construction in 2026 and early 2027, include:

  • Parfet Street (35th Avenue to 3550 Parfet Street)
  • I-70 Frontage Road (Holland Street to Garrison Street)
  • Harlan Street (32nd Avenue to 35th Avenue)

Round 2 segments, currently in design, include:

  • Miller Street (44th Avenue to 48th Avenue)
  • Pierce Street (29th Avenue to 44th Avenue)
  • 26th Avenue (Oak Street to Paramount Parkway)

Additional segments will be identified after completion of these first priority sections.


Miller Street Improvements

One of the sidewalk gaps that the city is currently working to fill is on Miller Street between 44th Avenue and the I-70 Frontage Road.

Why Miller Street

  • Miller Street links both Mountain Phoenix Community School and Compass Montessori Wheat Ridge to nearby neighborhoods, the Clear Creek Greenbelt, and parks that classes use for outdoor learning.
  • Many students arrive by car to these public charter schools that serve families from across the broader community, with parents and caregivers parking or dropping students off along Miller Street or nearby streets before students walk the remaining distance to school.
  • Sidewalks are narrow, damaged, or missing in places, and some curb ramps do not meet accessibility standards. Traffic, drop-off activity, and street crossings add to the risk for students on foot.

Planned Improvements to Miller Street

The city's proposed Miller Street improvements include:

  • Reconstructing or widening deficient sidewalks and closing sidewalk gaps along Miller Street;
  • Installing or improving ADA-compliant curb ramps;
  • Improving pedestrian crossings and pavement markings; and
  • Pairing the infrastructure improvements with school-based safety education and activities that encourage students and families to safely walk, bike, or roll to school.

Leveraging Grant Funding - How You Can Help!

To help make our funding go further, the city also pursues grant funding to supplement appropriate projects. Because of the proximity to two schools, Miller Street is a great candidate.

The city is preparing an application for Colorado Safe Routes to School funding to help construct the Miller Street improvements. As part of this effort, the City is partnering with Mountain Phoenix Community School and Compass Montessori Wheat Ridge to gather information about how students travel to school, where families encounter safety concerns, and how the planned improvements could make walking and biking safer.

If you are a parent at either of these schools, please fill out the survey below. Your feedback will help the city demonstrate the need for the project, strengthen its grant application, and support safer walking and biking connections for students and families. The city hopes to hear from at least one in four families at each school.

Please complete the survey by Friday, December 18 at 5 p.m. Thank you for taking the time to share your experiences!

  • Take Survey