Concept D
Concept D has the highest estimated construction and annual operating costs of the four concepts.
The concept includes a climbing wall, a small water crossing, and a water vortex (a circular current activity). A Flow Rider, which creates a continuous wave for surfing and bodyboarding, would be located on the west side of the facility.
The pool deck includes a larger shaded reservable group area in the northeast corner, along with seven shade umbrellas. The design preserves and expands the existing tree canopy.
Unlike Concepts A, B, and C, Concept D does not include a free splash pad outside the pool fencing.
Estimated Construction Cost: $16.2 million–$18.3 million
Estimated Annual Operating Cost: $752,000
