Concept D

Concept D has the highest estimated construction and annual operating costs of the four concepts.

The concept includes a climbing wall, a small water crossing, and a water vortex (a circular current activity). A Flow Rider, which creates a continuous wave for surfing and bodyboarding, would be located on the west side of the facility.

The pool deck includes a larger shaded reservable group area in the northeast corner, along with seven shade umbrellas. The design preserves and expands the existing tree canopy.

Unlike Concepts A, B, and C, Concept D does not include a free splash pad outside the pool fencing.

Estimated Construction Cost: $16.2 million–$18.3 million

Estimated Annual Operating Cost: $752,000

Concept D layout including lap pool, leisure pool, slides, a Flow Rider, and more. Concept is described in the preceding text.

Share Concept D on Facebook Share Concept D on X (formerly Twitter) Share Concept D on Linkedin Email Concept D link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>